Every Site. Every RFI.
One Command Center.
Stop rebuilding spreadsheets at 11 PM. Siteplan gives general contractors, owner's reps, and facility managers a single source of truth — loaded, live, and already working.
Punchlist Closeout Takes
0 Days Longer Than It Should
Across 847 construction projects analyzed in 2025, the average punchlist closeout time was 68 days. Teams using Siteplan closed the same scope in 19 days. The gap isn't effort — it's visibility.
Why the gap exists
The average GC spends 11.4 hours/week reconciling punchlist status across email threads, PDFs, and disconnected spreadsheets. Siteplan centralizes item assignment, photo documentation, and trade acknowledgment — eliminating the reconciliation loop entirely.
The RFI Bottleneck Costs
22.7 Days Per Item. We Cut It to 7.
Every unanswered RFI stops a trade in its tracks. We mapped the resolution lifecycle across 12,400 RFIs — and found four compounding delays that Siteplan eliminates by design.
Avg. 3.2 days lost per RFI to email chains
Arch + Structural review in sequence, not parallel
Owners see RFIs only when escalated
PM manually notifies sub after close
Parallel review routing, owner portal with push notifications, and automated trade relay cut resolution time by 68%.
Warranty Claims Leave
$0 on the Table Per Portfolio
34% of valid warranty claims are never filed — not because the damage isn't real, but because the documentation handoff was never done. Siteplan captures every inspection photo, sign-off, and expiration date from day one.
Start Your Free
Portfolio.
No credit card. No sales call. Your portfolio is live in 4 minutes — already populated with your properties, your trades, your data.
2025 Construction PM
Benchmark Report
The full 47-page study covering punchlist closeout times, RFI resolution benchmarks, warranty recovery rates, and change order dispute patterns — across 847 projects and $3.2B in construction value.
No spam. Unsubscribe anytime.